CE Vip- Beam Design

CE vip - Beam Design

CE - Analysis of rates - version 6

Civil Engineer ေတြအတြက္ CE analysis of rates- version 5 တင္ေပးလိုက္ပါတယ္။

Ebooks

Civil Engineering နဲ႕ပတ္သတ္ေသာ Ebook မ်ား

Etabs

Etabs ေလ့လာရန္

Site Mistake

Site Mistake

Etabs Tutorials

Download ဆြဲနည္း

Saturday, November 19, 2016

ကြန္ကရစ္ထုထည္ ေျပာင္းလဲျခင္း




ကြန္​ကရစ္​ထုထည္​ ​ေျပာင္​းလဲျခင္​း
*********************************

*** ကြန္​ကရစ္​ဟာ မာခဲ​ေနစဥ္​ အ​ေတာအတြင္​းမာ ထုထည္​ ​ေျပာင္​းလဲႏိုင္​ပါတယ္​။ အစိုဓာတ္​ ဆံုးရံူးရမယ္​ဆိုရင္​ က်ံဳ႕သြားမယ္​။ ဒါ​ေပမဲ့ ​ေရထဲမွာ မာခဲရမယ္​ဆိုရင္​ ျပန္​႔ကားလာမွာပါ။

*** ကြန္​ကရစ္​ရဲ႕ ထုထည္​​ေျပာင္​းလဲမႈ အ​ေၾကာင္​းအရင္​းမ်ားဟာ ၀န္​သက္​​ေရာက္​မႈ​ေတြ၊ အခ်ိန္​​ေျပာင္​းလဲမႈ​ေတြ၊ ​ေရနဲ႔ ဘိလပ္​​ေျမ ဓာတ္​ျပဳမႈ ျဖစ္​စဥ္​​ေတြနဲ႔ စိုထိုင္​းဆ ​ေျပာင္​းလဲမႈ​ေတြ​ေၾကာင္​့ လို႔ မွတ္​ယူႏိုင္​ပါတယ္​။
(ပထမဆံုးအေနနဲ႔ က်ံဳ႕တာကို စေျပာၾကမယ္)

>>> Shrinkage (က်ံဳ႕ျခင္​း)
************************

*** ကြန္​ကရစ္​ ​ေျခာက္​သြားလို႔ ​ေျပာင္​းလဲတဲ့ ထုထည္​နဲ႔ ​ေရဖယ္​ထုတ္​လိုက္​လို႔ ​ေျပာင္​းလဲတဲ့ ထုထည္​ဟာ မတူညီပါဘူး။ ​ေရ​ေငြ႔ျပန္​သြားတဲ့ ​ေရ​ေတြ​ေၾကာင္​့​ေတာ့ shrinkage မျဖစ္​ပါဘူး။ ျဖစ္​ရင္​လည္​း အနည္​းငယ္​ဘဲပါဘဲ။

*** ကြန္​ကရစ္​ဟာ ​ေျခာက္​လာမယ္​ဆိုရင္​ ​ေရ​ေငြ႕ျပန္​မယ္​။ ျပီး​ေတာ့ ထိန္​းထားတဲ့ ဘိလပ္​​ေျမအႏွစ္​​ေတြရဲ႕ ထုထည္​ဟာလညး္​ ​ေျပာင္​းပါတယ္​။ အဲဒါ​ဆိုရင္​​ေတာ့ shrinkage ျဖစ္​လာပါျပီ။ ကြန္​ကရစ္​မွာ ​ေရရဲ႕ tension capillary ​ေလး တိုးတိုးလာပါတယ္​။ capilleries ​ေတြ မရွိလို႔ ​ေရဆံုးရံူးသြား​တာနဲ႔ ​ေတာ့  shrinkage မျဖစ္​ပါဘူး။ ဒါ​ေပမဲ့ စုတ္​ယူထားတဲ့ ​ေရ​ေတြ ဖယ္​ထုတ္​လိုက္​မယ္​ဆိုရင္​​ေတာ့ shrinkage ျဖစ္​ပါျပီ။

*** အစိုဓာတ္​​ေျပာင္​းလဲတဲ့ အ​ေျခအ​ေန​ေတြက​ေန ​အ​ေၾကာင္​းရင္​းမ်ားစြာက ကြန္​ကရစ္​ က်ံဳ႕ျခင္​းကို ျဖစ္​​ေစပါတယ္​။

*** ၁။ ဘိလပ္​​ေျမႏွင္​့ ​ေရပါ၀င္​မႈ။   ။ ကြန္​ကရစ္​​ေဖ်ာ္​စပ္​ရာမွာ ​ေရ (သို႔) ဘိလပ္​​ေျမ ပိုမို ပါ၀င္​မယ္​ဆိုရင္​ shrinkage ပိုျဖစ္​ပါတယ္​။

*** ၂။ ဘိလပ္​​ေျမ​ေပါင္​းစပ္​ဖြဲ႕စည္​းမႈႏွင္​့ မႈန္​႔ညွက္​မႈ။   ။ ​ေစာလ်င္​စြာ strength  ရ​ေစတဲ့ ဘိလပ္​​ေျမနဲ႔ အပူထုတ္​မႈနည္​းတဲ့ ဘိလပ္​​ေျမ (High-early-strength and low-heat cement)  ဟာ ပံုမွန္​ဘိလပ္​​ေျမ​ေတြထက္​ shrinkage ပို​ျဖစ္​​ေစပါတယ္​။ မႈန္​႔ညွက္​တဲ့ ဘိလပ္​​ေျမ​ေတြဟာ စိုထိုင္​းတဲ့ အ​ေျခအ​ေန​ေတြမွာ ပိုမိုျပန္​႔ကားလာ​ေစပါတယ္​။

*** ၃။ ​ေရာစာမ်ား၏ တိုးတက္​​ေျပာင္​းလဲလာမႈ၊ အမ်ိဳးအစားႏွင္​့ ပမာဏ။    ။ ​ေသးငယ္​တဲ့ ​ေရာစာ​ေလး​ေတြဟာ shrinkage ကို ပိုမိုျဖစ္​​ေစပါတယ္​။ ၾကီးမားတဲ့ ​ေရာစာ​ေတြက​ေတာ့ shrinkage နည္​း​ေစပါတယ္​။

*** ၄။ ပတ္​၀န္​းက်င္​အ​​ေျခအ​ေနမ်ား၊ စိုထိုင္​းမႈႏွင္​့ အပူခ်ိန္​။   ။ ကြန္​ကရစ္​ ပံုစံငယ္​​ေလး​ေတြဟာ (concrete specimens)  စိုထိုင္​းတဲ့ အ​ေျခအ​ေနမွာ 200 to 300 x 10^(-6)  ထိ ျပန္​႔ကားလာ​ေစပါတယ္​။ ဒါ​ေပမဲ့ ​ေလထဲမွာ ​ေျခာက္​​ေသြ႕​ေအာင္​ ထားလိုက္​မယ္​ဆိုရင္​​ေတာ့ က်ံဳ႕သြားပါတယ္​။ ျမင့္​မားတဲ့ အပူခ်ိန္​​ဟာ ​ေရ​ေငြ႔ျပန္​ျခင္​းကို ျမန္​​ေစပါတယ္​။ ဒါ​ေၾကာင္​့  shrinkage ကို တိုးလာ​ေစပါတယ္​။ 

*** ၅။  Admixtures  ။   ။ ကြန္​ကရစ္​မွာ ​ေရလိုအပ္​ခ်က္​တိုး​ေစတဲ့ Admixtures ​ေတြဟာ shrinkage ကိုလည္​း တိုး​ေစပါတယ္​။

*** ၆။ အရြယ္​အစားႏွင္​့ ပံုစံ။ သံကူကြန္​ကရစ္​ member ​ေတြမွာ shrinkage ျဖစ္​တာ​ေၾကာင္​့ ကြန္​ကရစ္​ထဲမွာ tension stress ​ေတြ တုိးလာ​ေစပါတယ္​။ ထို႔အတူဘဲ steel မွာလည္​း compressive stress တိုးလာ​ေစပါတယ္​။ အဲဒီ stress ​ေတြဟာ သက္​​ေရာက္​​ေနတဲ့ loading ​ေတြနဲ႔​ေပါင္​းျပီး တိုးလာပါတယ္​။ ဒါ​ေၾကာင္​့ steel percentage မ်ားျပီး ထည္​့တဲ့အခါ ကြန္​ကရစ္​မွာ အက္​ကြဲ​ေၾကာင္​း (cracks) ​ေတြ ျဖစ္​​ေစႏိုင္​ပါတယ္​။ ကြန္​ကရစ္​ထဲက  tensile stresses ​ေတြကို reinforcement ​ေတြဆီ ​ေကာင္​း​ေကာင္​းျဖန္​႔ခြဲ​ေပးႏိုင္​မယ္​ ဆိုရင္​ internal stresses ကြာျခားခ်က္​ကို ​ေလ်ာ့ခ် ႏိုင္​ပါတယ္​။

*** Ordinary concrete  ​ေတြအတြက္​ ​ေနာက္​ဆံုးက်ံဳ႕ျခင္​းတန္​ဖိုး (final shrinkage values) ဟာ 200 က​ေန 700 x 10^(-6) ၾကားမွာ ​ေျပာင္​းလဲ​ေနပါတယ္​။ normal-weight concrete  အတြက္​ဆိုရင္​ 300 x 10^(-6) ကို သံုးႏိုင္​ပါတယ္​။

*** British Codes ​ေတြအရ 500 x 10^(-6)  ကို ​ေပးပါတယ္​။ အဲဒီမွာ ကြန္​ကရစ္ကို ခ်ဳပ္​မထားဘူးဆိုရင္​ 3 m အတြက္​ 1.5  mm shrinkage ျဖစ္​မယ္​ဆိုတဲ့ သ​ေဘာပါ။

3 m x (1000 mm) x 500 x 10^(-6) = 1.5 mm လို႔ အလြယ္​တကူ တြက္​ခ်က္​ႏိုင္​ပါတယ္​။

*** အကယ္​၍ member  ကို ခ်ဳပ္​ထားမယ္​ဆိုရင္​ tensile stress ( 10 N/mm2) 1400 psi ​ေပၚလာမွာပါ၊

*** setting ျဖစ္​ျပီးတဲ့​ေနာက္​မွာ အခ်ိန္​ကာလတစ္​ခု​ေလာက္​ အစိုဓာတ္​ကို ထိန္​းထားမယ္​ဆိုရင္​ shrinkage ကို ​ေလ်ာ့ခ်ႏိုင္​ပါတယ္​။ ထို႔​ေၾကာင္​့ (၇)ရက္​ထက္​ မနည္​းတဲ့ အခ်ိန္​ကာလတစ္​ခုအထိ ကြန္​ကရစ္​ရဲ႕ အစိုဓာတ္​ကို ထိန္​း​ေပးထားဖို႔ အ​ေရးပါလာတယ္​။

*** ​ေလတိုက္​တဲ့ ​ေနရာမွာ ကြန္​ကရစ္​ကို ထားမယ္​ဆိုရင္​ ​ေလလာတဲ့ဘက္​မွာ shrinkage ပိုျဖစ္​ပါလိမ္​့မယ္​။

*** shrinkage ဟာ structural member ​ေတြရဲ႕ deflection ကို တိုး​ေစပါတယ္​။ အခ်ိန္​နဲ႔ အမွ်တိုးလာ​ေနမွာပါ။

*** အဲဒါနဲ႔ အခ်ိဳးညီစြာဘဲ ကြန္​ကရစ္​ထဲမွာရွိတဲ့ သံ​ေခ်ာင္​းဟာ shrinkage ​ေၾကာင္​့ ျဖစ္​လာတဲ့ curvature  (​ေကြးညြတ္​ျခင္​း)နဲ႔ deflection  ကို ကာကြယ္​​ေပးႏုိင္​ပါတယ္​။

*** ​ေယဘုယ်အားျဖင္​့ၾကည္​့မယ္​ဆိုရင္​ ကြန္​ကရစ္​မာ​ေက်ာစကာလမွာ ျမင္​့မားတဲ့ ႏွဳန္​းနဲ႔ က်ံဳ႕မွာျဖစ္​ျပီး ​ေနာက္​ပုိင္​းမွာ​ေတာ့ တျဖည္​းျဖည္​းနဲ႔ ​ေလ်ာ့က်လာပါတယ္​။

*** အဲဒီ​ေတာ့ ၂ ပတ္​ၾကာတဲ့ အခါ shrinkage တန္​ဖိုးဟာ 15% က​ေန 30 % ထိ ရွိျပီး​ေတာ့ ၁ လ ​ၾကာတဲ့ အခါ 40 % က​ေန 80 % အထိ ျဖစ္​လာပါတယ္​။ ၁ ႏွစ္​ၾကာတဲ့ အခါမွာ​ေတာ့ 70 % က​ေန 85 % ထိ ျဖစ္​လာမယ္​လို႔ ဆိုႏိုင္​ပါတယ္​။

Ref; Structural Concrete Theory and Design
Min Han


Wednesday, November 16, 2016

List of ACI Codes

List of ACI Codes...
.
ACI Code ေတြကို List လုပ္ထားတာပါ.. List ထဲမွာ မပါေသးတာေတြ ႐ွိပါေသးတယ္။ Versions ေတြဆိုလဲ update မျဖစ္တာေတြ ႐ွိပါတယ္...
.
ACI 104-71  Preparation of Notation for Concrete
ACI 116R-00  Cement and Concrete Terminology
ACI 117-90)  Standard Specifications for Tolerances for Concrete Construction and Materials (ACI 117-90)
ACI 117R-90  Commentary on Standard Specifications for Tolerances for Concrete Construction and Materials
ACI 121R-98  Quality Management System for Concrete Construction
ACI 209R-92  Prediction of Creep, Shrinkage, and Temperature Effects in Concrete Structures (Reapproved 1997)
ACI 210R-93  Erosion of Concrete in Hydraulic Structures (Reapproved 1998)
ACI 211 Concrete Mix Design
ACI 211.1-91 Standard Practice for Selecting Proportions for Normal, Heavyweight, and Mass Concrete
ACI211.2-98 Standard Practice for Selecting Proportions for Structural Lightweight Concrete
ACI211.3R-02 Guide for Selecting Proportions for No-Slump Concrete
ACI211.4R-93 Guide for Selecting Proportions for High-Strength Concrete with Portland Cement and Fly Ash
ACI211.5R-01 Guide for Submittal of Concrete Proportions
ACI211.6T-14 Aggregate Suspension Mixture Proportioning Method
ACI211.7R-15 Guide for Proportioning Concrete Mixtures with Ground Limestone and Other Mineral Fillers
ACI211.8R-15 Guide to Troubleshooting Concrete Mixture Issues as Influenced by Constitutive Material, Jobsite Conditions 45.5$
ACI 212.3R-91 Chemical Admixtures for Concrete (Reapproved 1999)
ACI 212.3R-10 Report on Chemical Admixtures for Concrete
ACI 212.4R-93 Guide for the Use of High-Range Water-Reducing Admixtures (Superplasticizers) in Concrete (Reapproved 1998)
ACI 213R-03  Guide for Structural Lightweight Aggregate Concrete
ACI 214-77  Recommended Practice for Evaluation of Strength Test Results of Concrete (ACI 214-77)*
ACI 214.4R-03 Guide for Obtaining Cores and Interpreting Compressive Strength Results
ACI 215R-74  Considerations for Design of Concrete Structures Subjected to Fatigue Loading (Reapproved 1997)
ACI 216_89  Guide for Determining the Fire Endurance of Concrete Elements (Reapproved 1994)
216.1-97 Standard Method for Determining Fire Resistance of Concrete and Masonry Construction Assemblies
ACI 221R-96  Guide for Use of Normal Weight and Heavyweight Aggregates in Concrete (Reapproved 2001)
ACI 221.1R98 State of the Art Report on Alkali-Aggregate Reactivity
ACI 222R-96  Corrosion of Metals in Concrete
ACI222R-01 Protection of Metals in Concrete Against Corrosion
ACI 223-98  Standard Practice for the Use of Shrinkage-Compensating Concrete
ACI223R-10 Guide for the Use of Shrinkage-Compensiating Concrete (52$)
ACI 224R-90  Control of Cracking in Concrete Structures
ACI224R-01 Control of Cracking in Concrete Structures
ACI224.1R-07 Causes, Evaluation, and Repair of Cracks in Concrete Structures
ACI224.2R-94 Cracking of Concrete Members in Direct Tension
ACI224.3R-95 Joints in Concrete Construction
ACI224.4R-13 Guide to Design Detailing to Mitigate Cracking
ACI 225R-99  Guide to the Selection and Use of Hydraulic Cements
ACI 229R-99  Controlled Low-Strength Materials
ACI 232.2R-96 
ACI 233R-95  Ground Granulated Blast-Furnace Slag as a Cementitious Constituent in Concrete
ACI 234R-96  Guide for the Use of Silica Fume in Concrete* (ACI 234R-06)
ACI 237 Self-Consolidating Concrete
ACI 301-99  Specifications for Structural Concrete
ACI 301M-99  Specifications for Structural Concrete
ACI 302.1R-96 Guide for Concrete floor and Slab Construction
ACI 302.2R-06
ACI 303R-91  Guide to Cast-In-Place Architectural Concrete Practice
ACI 304R-00  Guide for Measuring, Mixing, Transporting, and Placing Concrete
ACI 305R-99  Hot Weather Concreting
ACI 306R-88  Cold Weather Concreting
ACI 307-98  Design and Construction of Reinforced Concrete Chimneys (ACI 307-98)
ACI 307R-98  Commentary on Design and Construction of Reinforced Concrete Chimneys (ACI 307-98)
ACI 308-92  Standard Practice for Curing Concrete (ACI308-92) (Reapproved 1997)
ACI 309R-96  Guide for Consolidation of Concrete
ACI 313-97  Standard Practice for Design and Construction of Concrete Silos and Stacking Tubes for Storing Granular Materials (ACI 313-97)
ACI 313R-97  Commentary on Standard Practice for Design and Construction of Concrete Silos and Stacking Tubes for Storing Granular Materials (ACI 313-97)
ACI 315-99  Details and Detailing of Concrete Reinforcement
ACI 315R-94  Manual of Engineering and Placing Drawings for Reinforced Concrete Structures (ACI 315R-99)
ACI 318-99  Building Code Requirements For Structural Concrete (ACI 318-99) And Commentary (ACI 318R-99)
ACI 318M-99  Building Code Requirements For structural Concrete (ACI 318M-99) And Commentary (ACI 318RM-99)
ACI318-02  Building Code Requirements For structural Concrete (ACI 318-02) And commentary (ACI 318R-02)
ACI 330R-92  Guide for Design and Construction of Concrete Parking Lots (330R-01)
ACI 332R-84  Guide to Residential Cast-in-Place Concrete Construction (1999)
ACI 343R-95  Analysis and Design of Reinforced Concrete Bridge Structures
ACI 345R-91  Guide For Concrete Highway Bridge Deck construction
ACI 346-90  Standard Specification for Cast-in-Place Nonreinforced Concrete Pipe (ACI 346-90) (Reapproved 1997)
ACI 346R-90  Recommendations for Cast-in-PlaceNonreinforced Concrete Pipe (Reapproved 1997)
ACI 347R-94  Guide to Formwork for ConcreteACI 349-97 Code Requirements for Nuclear Safety RelatedConcrete Structures (ACI 349-97)
ACI 349R-97  Commen t ary on Code Requirements for Nuclear Safety Rel a tedConcrete St ructures (ACI 349-97)
ACI 350R-89  Environmental Engineering Concrete Structures
ACI 352R-91  Recommendations For Design Of beam-Column Joints In Monolithic reinforced Concrete Structures
ACI 357R-84  Guide for the Design and Construction of Fixed Offshore Concrete Structures
ACI 359-92  Code for Concrete Reactor Vessels and Containments (ACI 359-92)
ACI 360R-92 Design of Slabs on Grade
ACI 363R-92 State-of-the-Art Report on High-Strength Concrete
ACI 371R-98  Guide for the Analysis, Design, and Construction of Concrete-Pedestal Water Towers
ACI 372R-00  Design and Construction of Circular Wire- and Strand-Wrapped Prestressed-Concrete Structures
ACI 373R-97  Design and Construction of Circular Prestressed Concrete Structures with Circumferential Tendons
ACI 435R-95  Control of Deflection in Concrete Structures
ACI 437R-91  Strength Evaluation of Existing Concrete Buildings
ACI 440R-96 State-of-the-Art Report on Fiber Reinforced Plastic (FRP) Reinforcement for Concrete Structures
ACI 441R-96 High-Strength Concrete Columns:State of the Art Report
ACI445R_99 RECENT APPROACHES TO SHEAR DESIGN OF STRUCTURAL CONCRETE
ACI 503R-93 USE OF EPOXY COMPOUNDS WITH CONCRETE
ACI 504R-90 Guide to Sealing Joints in Concrete strucutres
ACI 506R-90 Guide to Shotcrete
ACI 524R-93 Guide to Portland Cement Plastering
ACI 530-99 Building Code Requirement For Masonry Design
Aci 530r-99 Commentry On Building Code Requirement For Masonry Design
ACI 533R-93 Guide for Precast Concrete Wall Panels
ACI 543R-00 Design, Manufacture, and Installation Concrete Piles
ACI 546R-96 Concrete Repair Guide

ACI 547R-79 Refractory Concrete: Abstract of State-of-the-Art Report
ACI 549R-97 State-of-the-Art Report on Ferrocement
ACI 550R-96 Design Recommendations for Precast Concrete Structures
ACI 551 R-92 Tilt-Up Concrete Structures
ACI 124.1 R-92 BAHA I HOUSE OF WORSHIP
ACI 124.2R-94 THE MERCER MILE BUILDINGS
ACI 126.3R-99 Guide to Recommended Format for Concrete in Materials Property Database
ACI 201.1 R-92 Guide for Making a Condition Survey (Reapproved 1997)
ACI 201.2R-92 Guide to Durable Concrete
ACI 207.1R-96 Mass Concrete
ACI 207.2R-95 Effect of Restraint, Volume Change, and Reinforcement on Cracking of Mass Concrete
ACI 207.3R-94 Practices for Evaluation of Concrete in Existing Massive Structures for Service Conditions
ACI 207.4R-93 Cooling and Insulating Systems for Mass Concrete
ACI 207.5R-99 Roller-Compacted Mass Concrete
ACI 210.1 R-94 Compendium of Case Histories on Repair of Erosion-Damaged Concrete in Hydraulic Structures
ACI 211.1-91) Standard Practice for Selecting Proportions for NormalHeavyweight, and Mass Concrete (ACI 211.1-91) Reapproved 1997
ACI 211.2-98 Standard Practice for Selecting Proportions for Structural Lightweight Concrete (ACI 211.2-98)
ACI 211.3R-97 Guide for Selecting Proportions for No-Slump Concrete
ACI 211.4R-93 Guide for Selecting Proportions for High-Strength Concrete withPortland Cement and Fly Ash
ACI 211.5R-96 Guide for Submittal of Concrete Proportions
ACI 212.3R-91 Chemical Admixtures for Concrete
ACI 212.4R-93 Guide for the Use of High-Range Water-Reducing Admixtures (Superplasticizers) in Concrete
ACI 214.3R-88 Simplified Version of the Recommended Practice for Evaluation of Strength Test Results of Concrete
ACI 216.1-97 / Standard Method for Determining Fire TMS 0216.1-97 Resistance of Concrete and MasonryConstruction Assemblies
ACI 221.1R-98 State-of-the-Art Report on Alkali-Aggregate Reactivity
ACI 222.1-96 Provisional Standard Test Method for Water-Soluble Chloride Available for Corrosion of Embedded Steel in Mortar and Concrete Using the Soxhlet Extractor
ACI 224.1R-93 Causes, Evaluation and Repair of Cracks in Concrete Structures
ACI 224.2R-92 Cracking of Concrete Members in Direct Tension
ACI 224.3R-95 Joints in Concrete Construction
ACI 228.1R-95 In-Place Methods to Estimate Concrete Strength
ACI 228.2R-98 Nondestructive Test Methods for Evaluation of Concrete in Structures
ACI 230.1R-90 State-of-the-Art Report on Soil Cement
ACI 232.2R-96 Use of Fly Ash in Concrete
ACI 302.1R-96 Guide for Concrete Floor and Slab Construction 

Aung Hsu Myat


ေက်ာင္းဆင္းလာေသာ အင္ဂ်င္နီယာ တေယာက္အေနျဖင့္ မည္သည္တို႔ကို တပ္ကၽြမ္းသင့္သနည္း။

စာစဥ္ ၊ ၉၄ ၊ from school

Q 1. ေက်ာင္းဆင္းလာေသာ အင္ဂ်င္နီယာ တေယာက္အေနျဖင့္ မည္သည္တို႔ကို တပ္ကၽြမ္းသင့္သနည္း။

1. Drawing
drawing ကို၊ ေစ့စပ္ေသခ်ာစြာ၊ စိတ္ရွည္လက္ရွည္ဖတ္ၿပီး၊ အလုပ္သမားနဲ႔ဆက္ဆံေသာ shop drawing ေရးဆြဲႏိုင္ေအာင္၊ ေလ့လာအားထုတ္ရပါမည္။
2. Estimate
ခန္႔မွန္းေခ် စာရင္းကို၊ ပန္းရံေတ၊ လက္သမားေတကလည္း၊ ဘာလုပ္မယ္ဆိုရင္၊ ဘာေတဝယ္ေပးပါ ဆိုတဲ့၊ ခန္႔မွန္းေခ် စာရင္းစာရြက္ကေလးေတ၊ ေရးေပးတပ္ၾကပါတယ္။ ကိုယ္ကလဲ ကနဦးမွာေတာ့၊ yellow book ကို အမွီျပဳၿပီး ပစၥည္းေတာင္းခံလႊာေတမွာ ခန္႔မွန္းေခ်စာရင္းကေလးကို shop drawing မွတဆင့္ estimate ေသးေသးေလးေတာ့ ႀကိဳးစားၿပီးေရးဆြဲဘို႔ လိုပါတယ္။
3. Study
ကြင္းဆင္းၿပီးအေကာင္အထည္ေဖာ္တဲ့အခါ ဘယ္ကစၿပီးဘယ္လိုလုပ္မယ္ ဆိုတာကို ရံုးခန္းထဲမွာ ေၾကညက္ေအာင္ ေဆာင္ရြက္သြားဘို႔ လိုပါတယ္။
4. Work distribution
လုပ္ငန္းခြင္ထဲေရာက္တဲ့အခါ ဘယ္သူဘာလုပ္၊ ဘယ္လိုလုပ္ဆိုၿပီးေတာ့၊ လုပ္ငန္းတာဝန္ခြဲေဝေပးႏိုင္ရ ပါမည္။
5. Record
လုပ္ငန္းၿပီးတဲ့အခါ လုပ္ငန္းပမာဏ မည္မၽွကို လုပ္သားအင္အားမည္မၽွျဖင့္ အခ်ိန္မည္မၽွၾကာေအာင္ ေဆာင္ ရြက္ခဲ့သည္ကို သိရွိႏိုင္ရန္ လုပ္ငန္းစတင္ကတဲက မွတ္သားထားရပါမည္။
6. Decision
အထက္ပါ ၅ခ် က္ကို ေက် ညက္လာတဲ့အခါ လုပ္ငန္းေဆာင္ရြက္သည္ကိုလည္းေကာင္း၊ လုပ္ငန္းခြင္အခက္ အခဲမ်ားကိုလည္းေကာင္း မိမိ၏ ကိုယ္ပိုင္ဥာဏ္ျဖင့္ ဆံုးျဖတ္ေဆာင္ရြက္ႏိုင္စြမ္းရွိလာပါသည္။
7. Work permit
မိမိကိုယ္တိုင္ကလည္း၊ ကနဦးစတင္ေဆာင္ရြက္ရေသာ၊ လုပ္ငန္းသစ္ျဖစ္လ်င္ေသာ္လည္းေကာင္း၊ option - ေရြးခ်ယ္စရာ ၂ခုႏွင့္အထက္ ရွိေနလ် င္ေသာ္လည္းေကာင္း၊ မိမိအထက္က ပုဂၢိဳ လ္က အင္ဂ်င္နီယာ မဟုတ္ဘဲ သံသရပြားတပ္သူ ျဖစ္လ် င္ေသာ္လည္းေကာင္း၊ မိမိတာဝန္ခံႏိုင္ေသာ အကန္႔အသတ္ထက္ေက်ာ္လြန္ပါက၊ လုပ္ငန္းခြင့္ျပဳ မိန္႔ေတာင္းခံရပါမည္။

1. Input and out put
Drawing ကို စိတ္ရွည္လက္ရွည္ ေစ့စပ္ေသခ်ာစြာဖတ္ျခင္းသည္ Input ျဖစ္ပီး Shop Drawing ေရးဆြဲျခင္းသည္ output ျဖစ္ပါသည္

In put
1.1 Structure Notes , Archi Notes  မ်ား ဖတ္ျခင္း။
1.2 Site Plan ဖတ္ျခင္း။
1.3 Plans, sections & Elevations မ်ားကို တြဲဖတ္ျခင္း။
1.4 Detailed Drawing မ်ားဖတ္ျခင္း
1.5 3D Model ကို၊ ဖတ္ျခင္းတု႔ျဖစ္ပါသည္။
Out put
1.1 soft drawing ေရးဆြဲျခင္း။
အထက္ပါ in put ၅-မ်ိဳးကို၊ ႀကိဳးစားအားထုတ္ေနရင္း၊ ရႈတ္ေထြးသြားသည္မ်ားရွိတပ္သကဲ့သို႔၊ drawing တခ်ပ္ျခင္းတြင္၊ မိမိမလိုအပ္ေသးေသာ၊ data အခ်က္အလက္မ်ားကလည္း၊ ရႈတ္ေထြးေနသည္သာ၊ ျဖစ္ပါ သည္။ ထို႔ေၾကာင့္ drawing ေပၚရွိ၊ မိမိမလိုအပိေသးေသာ အခ်က္အလက္မ်ားကို ဖယ္ထုတ္ျခင္း၊ သို႔မဟုတ္ မိမိလိုအပ္ေသာ အစိပ္အပိုင္းမ်ားကိုသာ ကူးယူေရးဆြဲျခင္းျဖင့္ drawing ကို တေျဖးေျဖး ပိုမိုနားလည္လာ ပါလိမ့္မည္။ ၄င္းကို soft drawing ဟုေခၚပါသည္။ (အသံုးျပဳ လို႔ မရေသးပါ။)
1.2 shop drawing ေရးဆြဲျခင္း။
အထက္အပိုဒ္ 1.1 ပါ၊ soft drawing မ်ားေရးဆြဲၿပီးေသာအခါ အေဆာက္အဦးတခုလံုးကို အလြတ္နီးပါး ရသြားပါေတာ့သည္။ ထိုအခါ အေဆာက္အဦးကို လက္ေတြ႕ အေကာင္အထည္ေဖာ္ေဆာင္ရြက္ရာတြင္
(a) ပႏၷက္ ဘယ္လိုရိုက္မယ္။
(b) operation ဘယ္လိုခြဲမယ္။ construction joint ဘယ္ေနရာမွာထားမယ္။
(c) ေျမႀကီး ဘယ္လိုတူးမယ္။
(d) သံေခ်ာင္းဘယ္လိုေကြးမယ္ - bending schedule
(e) သံေခ်ာင္းဘယ္လိုျဖတ္မယ္။
(f) သံေခ်ာင္းဘယ္လိုဆင္မယ္။
(g) ပံုစံခြက္ကို ဘယ္အမ်ိဳးအစားသံုးမယ္။ ဘယ္လို ႀကိဳ တင္ျပဳလုပ္ထားမယ္။ ဘယ္လိုတပ္ဆင္မယ္။ ဘယ္လို ျပန္ျဖဳတ္မယ္။
(h) grade ဘယ္ေလာက္ရွိတဲ့ ကြန္ကရစ္ကိုသံုးရမယ္။ m3 ဘယ္ေလာက္ရွိတယ္။ manual, boom pump, stationary pump, bucket ဘယ္ဟာကို အသံုးျပဳၿပီးေတာ့၊ ဘယ္လိုေလာင္းမယ္။ curing ဘယ္လိုလုပ္မယ္။
အစရွိသည္တို႔၊ ပံုစံငယ္မ်ားေရးဆြဲၿပီးေတာ့၊ estimate ငယ္မ်ားတြက္ခ်က္ကာ၊ အလုပ္သမားကို၊ အသင့္ညႊန္ ၾကားႏိုင္ေအာင္၊ ေဆာင္ရြက္ရေသာလုပ္ငန္းကို၊ construction engineer တို႔၏၊ သို႔မဟုတ္ site engineer တို႔၏၊ shop drawing ဟု၊ ေခၚပါသည္။

2. Operation
Operation ဆိုသည္မွာ၊ တႀကိမ္တည္းႏွင့္ အၿပီးတည္ေဆာက္ေသာ၊ လုပ္ငန္းအစိတ္အပိုင္းတရပ္ကို၊ one operation ဟုေခၚပါသည္။ plan area ႀကီးပါက ၊ ၾကမ္းခင္းေလာင္းသည့္အခါ၊ construction joint မ်ားထားၿပီး၊ operation ၂ခု၊ ၃ခု၊ ခြဲၿပီးလုပ္ၾကရပါသည္။ အထပ္အျမင့္ တထပ္တိုင္းတထပ္တိုင္းတြင္လည္း၊ တထပ္လ်င္ column မ်ားကို၊ operation တခု၊ ၾကမ္းခင္းကို operation တခု၊ လုပ္ၾကသည္မ်ားရွိသကဲ့သို႔၊ column + ၾကမ္းခင္း တထပ္စာကို၊ operation တခု လုပ္ၾကသည္လည္း ရွိပါသည္။



ျမန္မာျပည္ေဆာက္လုပ္ေရးေလာကမွ အယူအဆအလြဲမ်ား(၂၂)

ျမန္မာျပည္ေဆာက္လုပ္ေရးေလာကမွ အယူအဆအလြဲမ်ား(၂၂)
အထပ္ျမင့္အေဆာက္အဦမ်ားသည္ အထပ္နိမ့္ထက္ ငလွ်င္လွဳပ္ရင္ ပိုခံရတယ္

အမ်ားစုထင္တာက အထပ္ျမင့္အေဆာက္အဦေတြက ငလွ်င္လွဳပ္ရင္ အထပ္နိမ့္ေတြထက္ ငလွ်င္ဒဏ္ကို ပိုခံစားရလြယ္တယ္။ ပိုေၾကာက္ဖို႔ေကာင္းတယ္လို႔ ထင္တတ္ပါတယ္။  တကယ္ေတာ့ အထပ္ျမင့္ေတြက အထပ္နိမ့္ထက္ ငလွ်င္လွဳပ္ရင္ ပိုလံုျခံဳစိတ္ခ်ရပါတယ္။ (ငလွ်င္ဒဏ္ခံေအာင္ေတာ့ DESIGN လုပ္ထားဖို႔ေတာ့ လိုမွာေပါ့ :-)  )

1) ငလွ်င္လွဳပ္တဲ့ အခါ အေဆာက္အဦေျမေနရာမွာ လႊမ္းမိုးတဲ့ Site Period ဆိုတာ ရွိပါတယ္။ Site က ေက်ာက္သား (Rock) ေတြနဲ႔ ဖြဲ႔စည္းထားရင္ Fundamental frequency of shaking က တိုၿပီး ေျမေပ်ာ့ (soft soil) ေတြနဲ႔ ဖြဲ႔စည္းထားရင္ေတာ့ Fundamental frequency of shaking က ရွည္ပါမယ္။ ဒီလို site ရဲ႕ Ground အေျခအေနေပၚမူတည္တဲ့ Site Period က 0.5s (Rock) ကေန 2.5s (soft soil) အထိ ရွိပါတယ္။

2) Building (အေဆာက္အဦ) မွာလဲ သူ႔ရဲ႕ Fundamental Period (T) ဆိုတာရွိပါတယ္။ T ကို ခန္႔မွန္းတဲ့ Formulas ေတြ အမ်ားႀကီး ရွိပါတယ္။ အၾကမ္းအားျဖင့္ေတာ့ အထပ္အေရအတြက္ (N) ကို 0.1s နဲ႔ ေျမွာက္ၿပီး ခန္႔မွန္းႏိုင္ပါတယ္။ ဥပမာအားျဖင့္ 5 ထပ္ဆို 0.5s နဲ႔ 25 ထပ္ဆို 2.5s ပါ။ (ဒါက အၾကမ္း ခန္႔မွန္းတာပါ။)

3) အေဆာက္အဦ ပ်က္စီးမႈက Site နဲ႔ Building Period ထပ္တူက်တဲ့အခါ (ဒါကို Resonance လို႔ေခၚပါတယ္။) ပိုမိုဆိုးရြားေစပါတယ္။

4) Ground က Period က 0.5s (Rock) ကေန 2.5s (soft soil) အတြင္းရွိႏိုင္တဲ့အတြက္ 5ထပ္ကေန 25ထပ္ၾကား အေဆာက္အဦေတြက ပိုမိုအႏၱရယ္ရွိပါတယ္။ 25 ထပ္ထက္ျမင့္တဲ့ အေဆာက္အဦေတြကေတာ့ ဒီ Resonance range ရဲ႕အျပင္မွာ က်ေနတဲ့အတြက္ ဒီိုအႏၱရယ္ကေနေတာ့ ပိုၿပီး သက္သာရာရေစပါတယ္။

5) (Comment က ပံုကို ၾကည့္ႏိုင္ပါတယ္.) Very Short Period ျဖစ္တာတစ္ခုကို စဥ္းစားၾကည့္ပါမယ္။ (T<0.7s ဆိုရင္ short period လို႔ေခၚၿပီး T>0.7s ကို Long Period လို႔ေခၚပါတယ္။) Very Short Period  ျဖစ္လို႔ Rigid လဲျဖစ္ပါတယ္။ ငလွ်င္လွဳပ္ရင္ Ground ေရြ႕သလို သူက လိုက္ေရြ႕ေနပါမယ္။
Very Long Period ျဖစ္တာတစ္ခုကို စဥ္းစားၾကည့္ပါမယ္။( ဥပမာ T=10s အထပ္100 ေလာက္) သူကေတာ့ Flexible ျဖစ္ပါတယ္။ Ground ကေရႊ႕ေနေပမယ့္ ထိပ္မွာေတာ့ ျငိမ္ေနတယ္လို႔ ယူဆႏိုင္ပါတယ္။
ဒီသေဘာတရားကို လက္ေတြ႔သိႏိုင္ေအာင္ ခ်ိန္သီးတစ္ခုကို ႀကိဳးတိုတိုထားၿပီး ရမ္းၾကည့္ပါ။ ခ်ိန္သီးရမ္းခါေနတာကို ေတြ႔ရမွာျဖစ္ၿပီး ႀကိဳးကို တေျဖးေျဖးရွည္ၿပီး စမ္းၾကည့္တဲ့ အခါ ႀကိဳးရွည္လာတာနဲ႔အမွ် ခ်ိန္သီးက သိပ္မရမ္းေတာ့တာ ေတြ႕ရပါလိမ့္မယ္။ (ဒါကို Seminar တစ္ခုမွာ ဆရာဦးေစာေထြးေဇာ္ လက္ေတြ႕ လုပ္ျပသြားတာကို ၾကည့္ခဲ့ရပါတယ္။)

6) အထပ္ျမင့္ေတြက ငလ်င္ျပင္းအားမမ်ားတဲ့ေနရာမွာဆိုရင္ Wind ကို စဥ္းစားၿပီး Lateral Load ခံႏိုင္ေအာင္ Design လုပ္ထားတာက Earthquake ထက္မ်ားေနႏိုင္ပါတယ္။ အဲ့အတြက္လဲ ငလွ်င္ဒဏ္ကို ေကာင္းေကာင္းခံႏိုင္ရည္ ရေစပါတယ္။ ငလွ်င္ျပင္းအားမ်ားတဲ့ေနရာ ဆိုရင္လဲ နံပတ္(၅) အခ်က္မွာေျပာထားသလို Flexibel ျဖစ္တဲ့အတြက္ ငလွ်င္ဒဏ္ကို ျပင္းျပင္းမခံရေစပါဘူး။

Photo Credit : Internet

(ဗိုလ္ဗိုလ္ေက်ာ္)


Civil နဲ႔ ပတ္သက္တဲ့အေမးအေျဖ (၂၁)

Civil နဲ႔ ပတ္သက္တဲ့အေမးအေျဖ (၂၁)
Secondary, distribution, shrinkage or temperature reinforcement

ေမး - One-way Slab မွာ Slab ေပၚက်ေရာက္တဲ့ loads မွန္သမ်ွကို Short Direction က ထမ္းတယ္လို႔ ယူဆျပီး Shorter span မွာ rebar သံေခ်ာင္းေတြ ထည့္ပါတယ္။ Long span မွာၾက load ထမ္းစရာမလိုဘဲ ဘာလို႕ သံေခ်ာင္းထည့္ရတာပါလဲ Temperature & shrinkage အတြက္ ထည့္တာပါလား။ ေနာက္ Long span မွာ ထည့္တဲ့ သံေခ်ာင္းကို Distribution steel လို႔ ဘာလို႔ေခၚတာပါလဲ…

ေျဖ - One-way Slab မွာ Main flexural reinforcement (moment အတြက္ထည့္တဲ့ rebar) ကို Short span မွာ ထည့္ရပါတယ္။ သူနဲ႔ ေထာင့္မွန္က် Long span မွာထည့္ရတဲ့ reinforcement ကိုၾက secondary, distribution, shrinkage or temperature reinforcement စသျဖင့္ေခၚပါတယ္။

Long span မွာ ထည့္တဲ့ rebar က flexural reinforcement အတြက္ ထည့္တာမဟုတ္ပါ။ သူ႔ကိုထည့္ရတဲ့ ရည္ရြယ္ခ်က္က အဓိက ႏွစ္ခ်က္ရွိပါတယ္။
1) concrete ကေလာင္းျပီး မာလာျပီဆိုရင္ က်ံဳ႕ပါတယ္။ အဲ့လိုက်ံဳ႕တာကို လြတ္လြတ္လြပ္လြပ္ က်ံဳ႕ခြင့္ရမယ္ဆို ျပႆ နာသိပ္ရွိခ်င္မွ ရွိမွာပါ။ အဲ့လိုမွမဟုတ္ဘဲ (သူ႔အစြန္ေတြမွာသူနဲ႔တြဲေလာင္းထားတဲ့ beams ေတြ walls ေတြက) ခ်ဳပ္ေႏွာင္ထားမယ္ဆိုရင္ အဲ့လို က်ံဳ႕တဲ့အခါ concrete ထဲမွာ tension stress (shrinkage stress) ေတြေပၚလာျပီး hairline cracks ေတြ ျဖစ္လာႏိုင္ပါတယ္။ concrete က tension ကို ခံႏိုင္ရည္နဲတဲ့အတြက္ rebar ထည့္ရတာျဖစ္ပါတယ္။ အဲ့လိုက်ံဳ႕တာက Direction ၂ဖက္စလံုးမွာ ျဖစ္မွာပါ။
ေနာက္ျပီး Concrete မာျပီး ေနာက္ပိုင္းလဲ ႀကံဳရႏိုင္တဲ့ Temperature changes ေၾကာင့္ျဖစ္မယ့္ volume changes ေတြ ခံႏိုင္ရည္ရွိေအာင္လဲ long span rebar ကိုထည့္တာပါ။ ဒါေၾကာင့္ လဲ temperature & shrinkage steel လို႔ေခၚတာပါ။
2) One-way slab မွာ Short span ကသာ loads ေတြကို ထမ္းတာပါ။ ဒါေပမယ့္ အဲ့လို short span က ထမ္းတာမွာ load ကို distributuon ေကာင္းေအာင္ လုပ္ေပးဖို႔အတြက္ အလုပ္ကို long span rebar က လုပ္ေပးပါတယ္။ ဒါေၾကာင့္လဲ distribution steel လို႔ေခၚတာ ျဖစ္ပါတယ္။

ဒီလိုရည္ရြယ္ခ်က္ေတြနဲ႔ ထည့္တဲ့ rebar ကို %အေနနဲ႔ (rho) Grade 40 နဲ 50 အတြက္ 0.2% နဲ႔ Grade 60 အတြက္ 0.18%ထည့္ရပါတယ္။ Grade 60 အထက္ကိုေတာ့ ပံုမွာၾကည့္ႏိုင္ပါတယ္။
Maximum spacing အေနနဲ႔ေတာ့ slab အထူရဲ႕ 5 ဆနဲ႔ 18" ထဲက ငယ္တာကို ယူသံုးရပါမယ္။

ပံုကေတာ့ ACI 318 က ယူပါတယ္
Credit
(ဗိုလ္ဗိုလ္ေက်ာ္)




Tuesday, November 15, 2016

#Civil #စာအုပ္စင္

တစ္အုပ္ဖတ္ၿပီးမွ ေနာက္တစ္အုပ္ ထပ္ေဒါင္းေစခ်င္ပါတယ္။ ေက်ာ့္အေတြ႕အၾကံဳေပၚ မူတည္ၿပီး တတ္ႏိုင္သမၽွ အစဥ္လိုက္ျဖစ္ေအာင္ စီထားပါတယ္။ ထပ္မံျဖည့္ဆြက္သြားပါမယ္။
လိုခ်င္တဲ့ စာအုပ္ ေတာင္းႏိုင္သလို စာအုပ္ေကာင္း ရွိသူမ်ားလည္း ေပးၾကပါဦးလို႔။https://static.xx.fbcdn.net/images/emoji.php/v5/fd0/1/16/1f602.png😂https://static.xx.fbcdn.net/images/emoji.php/v5/f4f/1/16/1f601.png😁
Structure to design( 11.4MB)
Civil Basic ( 3.3MB)
Understanding dwg( 13.6MB)
Steel design( 4.0MB)
RC design 14th, Nilson( 36.8MB)
15th( 23.1 MB)
YELLOW BOOK
FPS (25.5 MB)
SI (2.1MB)
Sample estimate(excel)
Structural Analysis( 30.1MB)
ACI 318-14( 19.1MB)
AISC Steel construction13th( 58.4MB)
14th ( 46.6 MB)
Field reference (32.2 MB)
Geotechanical 7th( 10.2MB)
Soil mechanic 4th ( 18.9 MB)
Design of RC 9th( 14.9MB)
Spreadsheet
Steel designer 6th( 10.4MB)
7th( 67.8MB)
ACI detailing315R( 12.2MB)
RC detailing ( 2.7 MB )
AISC detailing ( 22.4MB)
Survey( 25.6MB)
M&E ( 4.5MB)
AutoCAD Basic ( 1.1 MB)
AutoCAD 2D( 5.7MB)
AutoCAD 3D( 4.3MB)
RC mechanic & design7th( 55.3MB)
Project management 4th( 3.6MB)

. Structural and stress analysis

CIVIL ENGINEERING EBOOKS (67 items)


ဒီေလာက္ဖတ္ၿပီးရင္ေတာ့ အပ်င္းလည္းေျပေအာင္ ဒါေလးေတြ ဆက္ဖတ္သင့္ပါတယ္။ ဖတ္ၿပီး ေကာင္းက်ိဳးမရဘူးဆိုရင္ bill ျပန္ေလ်ာ္ပါ့မယ္။https://static.xx.fbcdn.net/images/emoji.php/v5/f4f/1/16/1f601.png😁
ဇာတက( 74.1MB)
မဂၤလသုတ္( 9.5MB)
ေမတၱာသုတ္( 1.2MB)
မိတၱဗလဋီကာ( 19.1MB)
ဘာသာႀကီး ၄ခု အႏွစ္သာရမ်ား (19.6 MB)

ျမန္မာလိုေရးထားတဲ့ အင္ယာစာအုပ္ေတြပါ။ အေပၚကစာအုပ္ေတြ ဖတ္ၿပီးမွသာ ေဒါင္းသင့္ပါတယ္။https://static.xx.fbcdn.net/images/emoji.php/v5/f7f/1/16/1f60a.png😊
Structure ( 4.3MB)
Construction (15.8MB)
RC design ( 10.6MB)
အင္ယာလက္စြဲ ( 9.4MB)
သံခ်ည္သံေကြး ( 3.1MB)
Site engineer ေတြ ေဆာင္ထားဖို႔ပါ။
ACI Guide to formwork for concrete
ACI Tolerences for RC construction
ACI Construction joints
Easy steel structure properties
Typical steel connections
Cement- EN 197
သီးသန္႔ က႑
Cable stayed bridge( 53.5MB)
Suspension bridge ( 18.0MB)
Dynamic of structure 4th (15.7 MB)
RC ( Volume 1,2,3)
volume (1)
volume (2)
volume (3)
Steel( 1-2-3 )
Structural steel design 5th
Steel conection 2nd
Steel structure ASD/LRFD
.
.
Credit
Seithu Min

Disqus Shortname

Comments system